Start with the application and operating duty. Use the generation-options evaluation worksheet to compare two generation or hybrid configurations against the same capacity, dispatch, infrastructure, interconnection and support requirements.

The two-page PDF provides blank editable fields for site requirements and Option A / Option B findings and sources. It organizes a site-specific discussion; it does not rank vendors or determine engineering feasibility.

Download the generation-options evaluation worksheet (PDF)Open worksheet PDF

How to use the worksheet

  1. Enter the utility or site, preparer and date, application and connection point. Name the two configurations being compared.
  2. For each category, define the site requirement, then record each option’s findings and source IDs using consistent units and conditions.
  3. Mark unknowns “evidence needed.” Record the document, revision and page supporting each finding. Use another copy for additional options.
  4. Capture the open issue, evidence to request, responsible owner and next review in the final field.

Download and save the worksheet in a PDF reader that supports form fields to retain your entries, or print it to complete by hand. The download remains blank, with 32 editable fields.

1. Capacity / net output

Record net kilowatts (kW) at the agreed electrical point, peak and minimum load, auxiliary demand and site derating. For storage or hybrid configurations, also record usable kilowatt-hours (kWh).

Compare output at the same electrical boundary and site conditions, not just equipment nameplate ratings.

2. Dispatch / startup

Record dispatch hours, cold and warm start times, online ramp, minimum stable output, load steps and reactive-power requirements.

Distinguish starting from an offline state from changing output while already online. Request evidence for the operating duty your site needs.

3. Outage duty

Record outage hours and energy, interruption tolerance, islanding and black-start needs, load pickup and loss of a resource.

Define the loads and outage cases first. Equipment capacity alone does not establish outage endurance or the ability to form an island.

4. Fuel / water dependencies

Record fuel quality, pressure, flow and resupply; water flow, quality and treatment; startup inputs and the contingency for loss of supply.

Include supply continuity during the event being evaluated, rather than assuming normal-service availability.

5. Site infrastructure

Record the full footprint and clearances, cooling and exhaust, fuel and water equipment, access, safety and permitting constraints.

Evaluate the complete installed configuration and supporting equipment, not only the generation package.

6. Interconnection

Record voltage and export arrangements, one-line and protection needs, metering and communications, islanding and reconnection approvals, controls and tests.

Apply the serving utility’s current requirements. Planning references do not establish project approval.

7. Operating support

Record staffing and training, service coverage, maintenance, downtime, parts and consumables, and the owners for commissioning and acceptance.

Identify who operates and maintains each part of the proposed configuration, and what support is available for the site.

8. Evidence / readiness

Request dated net-output and duty-cycle data, including the tested configuration, conditions and duration. Label measured results, estimates, projections and plans separately; confirm delivery and support readiness.

Record the source, revision and relevant page with each finding. Where evidence is missing, record the question rather than inferring performance.

Where H2PWR Systems may fit

Evaluate H2PWR Systems™ alongside other generation options against the same site duty. RPW lists planned 250 kW, 500 kW and 1 MW sizes. Planned ratings and readiness are not demonstrated net output or site-duty performance; request evidence for the proposed configuration from the company.

Original worksheet references

These are the three references linked in the PDF. Use them for planning context, then record the applicable source detail in each option column.

Discuss your site requirements

Send your utility, application, connection point, operating duty and open evidence questions to Resilient Power Works for a site-specific discussion.

resilient-power-works@brainer.one

Resilient Power Works · Generation-options evaluation worksheet · November 2026